課題にランクを付けると、現在の列およびスイムレーン内での相対的な優先度が変更されます。課題にランクを付けると、製品/スプリントバックログ内のタスクをより効果的に整理することができます。
Rankings allow you to prioritise issues at a more granular level than issue priorities in JIRA, as rankings can help you to determine whether a single issue is more important/urgent than another single issue. For example, you may have two separate issues which both have a priority of 'Major'. Using GreenHopper ranking, you can assign one of the issues a higher ranking than the other.
To rank an issue in Plan mode (if you are using Scrum):
Click the Agile link's down-arrow in the top navigation bar, select Rapid Board, then select your preferred Rapid Board from the resulting dropdown menu.
- Click Plan to go to Plan mode.
- Rank an issue by dragging and dropping it to a higher or lower position in the backlog (see Screenshot 1 below).
To rank an issue in Work mode (if you are using Kanban):
Click the Agile link's down-arrow in the top navigation bar, select Rapid Board, then select your preferred Rapid Board from the resulting dropdown menu.
- Click Work to go to Work mode.
- Rank an issue by dragging and dropping it to a higher or lower position within its current column (see Screenshot 2 below).
If an issue has subtasks that are in the same column and swimlane as itself, the subtasks will be shown in a group below the issue.
- When you rank an issue that has subtasks, all of the subtasks that are currently grouped with that issue will be automatically moved with it.
- サブタスク課題のランク付けは、「兄弟」課題と関連付けてのみ行うことができます。
You can also use Keyboard Shortcuts 's' + 'b' to move an issue to the bottom of its current column, or 's' + 't' to move it to the top.
注意:
- ランク付けが有効化されている場合にのみ課題にランクを付けることができます — ランク付けを有効にするを参照してください。
- You can only rank issues if you have the 'Schedule Issue' permission for the issue you want to move higher or lower on your Rapid Board.