Rolling values up to parent issues
このページの内容
関連コンテンツ
For parent issues, you can choose to display a preview of the rolled-up values of the child issues in several fields in a plan. At the moment, you can roll up the following values, from child issues to the corresponding parent issues:
- 見積もり
- teams
- スプリント
- リリース
In the example below, the values of teams are being rolled up, from the child issues to the parent issues.
In this example, you have the parent initiative TIS-118, with the following child epics: PERF-2 and PERF-6. Drilling down further, PERF-2 is also the parent epic of the child stories PERF-3, TIS-128, and TIS-148. The teams for the child stories have already been selected.
With rolled-up values enabled, PERF-2 is displaying the rolled-up value of Performance Engineering for its team. The same team value then rolls up to the parent initiative, TIS-118.
This doesn't mean that these teams are set in stone — this is just a preview, and you can still choose the teams for the epic and initiative here. You can still even change up the teams of the child stories, if needed.