「作業負荷円グラフ」レポートは、プロジェクトまたは課題フィルターのすべての課題の担当者に関連する作業負荷を示します。

Note: this report is only available if your JIRA administrator has enabled time-tracking and installed the JIRA Charting Plugin.

On this page:

What does the 'Workload Pie Chart' report look like?

生成されるレポートは次のようになります。

スクリーンショット: "ワークロード円グラフ" レポート

Generating a 'Workload Pie Chart' report

To generate a user workload report:

  1. On the top navigation bar, click the white triangle next to 'Projects'. The projects dropdown will display.
    (tick) Tip: If you click on the 'Projects' link instead of the triangle, the summary for your current project will display.
  2. Click the project that you wish to browse. If it is not displayed in the dropdown, click 'View All Projects' — you will be able to view a list of all projects set up in your JIRA instance and select your project from there. (The choice of project will not affect the report.)
  3. Click the 'Reports' menu on the right of the page and click 'Workload Pie Chart Report' from the dropdown menu that displays. The following form will appear:
  4. Select the project or issue filter for which you wish to generate a Workload Pie Chart report.
  5. In the 'Statistic' drop-down list, select the field on which the pie chart will be based (this will usually be Assignee).
  6. Click 'Next' to generate the report (see screenshot in previous section above).

Internet Explorer のキャッシュ構成について

Internet Explorer をご利用の場合、チャートを適切に出力できるようブラウザを構成する必要があります。

  1. Select 'Internet Options' from the 'Tools' menu:
  2. The 'Internet Options' window will display. Click the 'Settings' button in the 'Temporary Internet files' (i.e. cache) section:
  3. The 'Settings' window will display. Ensure that you have do not have the 'Every visit to the page' (i.e. no caching) option selected. If so, select the 'Automatically' option instead.