Index
[Downloads (PDF, HTML & XML formats)]
[Other versions]
Documentation for GreenHopper 6.2.x. Documentation for earlier versions of GreenHopper is [available too].
2013 年 1 月 24 日
The Atlassian team announces the release of GreenHopper 6.1.2, enabling you to:
This release also includes a number of fixes.
Upgrading to GreenHopper 6.1.2 is free for all customers with an active GreenHopper license.
If you are using GreenHopper "behind-the-firewall" (that is, if GreenHopper is installed on-premises at your site), you can upgrade GreenHopper via the JIRA Plugin Manager. Before upgrading, please read the GreenHopper 6.1.2 Upgrade Notes.
If you are using GreenHopper OnDemand, please watch the GreenHopper OnDemand Release Summary for the latest updates.
We are pleased to announce that you can now find issues in a given epic by simply using the epic's name in your JQL search, e.g.:
"epic link" = Jupiter
You can still use the epic's issue key (as previously) if you wish, e.g.:
"epic link" = ANERDS-317
Please note that your administrator will need to re-index JIRA before you can search by epic name.
エピック レポートは、エピックの完了課題、未完了課題、非見積課題の一覧を表示します。このレポートは、特に複数のスプリントにまたがるエピックの作業を計画するのに役立ちます。
エピック レポートを使用して、エピックの完成に向けた進捗状況を時間の経過とともに把握し、未完了課題または非見積課題といった残りの作業量をトラッキングします。
From Plan mode, you can now easily jump to the Issue Navigator and view/action your selected issues (see screenshot above).
Need to edit, transition, delete or move a bunch of issues? From Plan mode, you can now perform a JIRA Bulk Change on your selected issues (see screenshot above).
In GreenHopper 6.0.3 we introduced the ability to add text-fields to your cards; in 6.0.5, we added numeric fields; and in 6.0.8, we added date/time fields.
In 6.1.2, you can now also add custom fields of the following types:
By (very) popular request, you can now exclude weekends from your cycle time (that is, the time taken to resolve an issue).
For most teams, including the weekend will artificially inflate your actual cycle time. So now, when viewing the Control Chart, you can simply choose to exclude your non-working days:
GreenHopper 6.1.2 includes the following updates and bug fixes: