Sprint Report Inaccuracies after Workflow Change

お困りですか?

アトラシアン コミュニティをご利用ください。

コミュニティに質問


問題 

Jira Software loses viability on an issue's change history when a previously existing status is removed ( changed ) from the project's workflow. This affects sprint reports for both current and closed sprints. It also affects any status that is in the far right corner (Done) or the far left (To Do).

再現手順

Situation A.

  1. Configure a workflow with the following statuses:
    Open -> In Progress -> Resolved -> Closed
  2. Create a sprint, add an issue from the backlog, transition every step from Open until Closed, and complete the sprint
  3. Create new workflow with the following statuses:
    Open -> In Progress -> Status 9
  4. Change the workflow for the project, or issue type,  map issues in Resolved and Closed to Status 9

Situation B.

Update the statuses in a current workflow that are mapped to:

  • 作業前
  • 完了

予想される結果

Sprint reports are unaffected by this change.

Actual Results 

Sprint report show issues moved from Resolved and Closed to Status 9 removed From sprint. Cycle Time is also incorrectly calculated for these issues as well.


注意

Other Sprint reports may be affected from this change.
While the original report comes from Jira 6.4 / Jira Agile 6.7, we were able to reproduce this problem in Jira 8.x as well. This can affect any status on the far right or far left. For example, if you leave out a to do status from the old workflow, the sprint report will not see that the issues were ever "started" and it will negatively affect burn-down and velocity. 

回避策

Modify the affect project's workflow, add changed status back, and map this status to a column in the project's board (respective to their position in the old board i.e. far right or far left). They do not need transitions to or from other statuses. In the example above, Agile reporting is fixed by adding Resolved and Closed back to the affected project's workflow and mapping the statuses to the Done column accordingly.

For more information see JSWSERVER-16687 - Getting issue details... STATUS

説明 Jira Software loses viability on an issue's change history when a  previously existing status is removed ( changed ) from the project's workflow. This affects sprint reports for both current and closed Sprints. It also affects any status that is in the far right corner (done) or the far left (to do) 
製品Jira
プラットフォームサーバー、Cloud、Data Center
Last modified on Mar 21, 2024