管理図には、製品やバージョンあるいはスプリントのサイクルタイムまたはリードタイムが表示されます。管理図の横軸( x 軸)は時間を、縦軸( y 軸)は課題がステータスで消費した日数を示します。
管理チャートは、現在のスプリントから得られるデータを今後のパフォーマンスの決定に使えるかどうかを確認するのに役立ちます。課題のサイクル タイムの分散が少ないほど、その平均値 (または中央値) を今後のパフォーマンスの指標として使用することへの信頼度が高くなります。
Note that the Control Chart is board-specific, that is, it will only include issues which match your board's Filter.
Issues which are currently in statuses that are not mapped to one of the columns of the board will not be included in the Control Chart (even if those issues were in one of the mapped statuses earlier).
On this page:
Click Refine at the top right of the chart to select which column(s) to include.
The control chart includes all issues that spent time in any of the selected columns and are no longer in any of the selected columns. Therefore, selecting the To Do and In Progress columns will normally show you the cumulative time from issue creation to completion (as you will only see issues that spent time in these columns and are not located there anymore — that is, you will see all issues that are currently Done).
If you select only the In Progress column you will see the time an issue has spent in development. That is, you will only see issues that passed through In Progress but are now either located in To Do or Done. Issues that moved directly from To Do to Done won't show up; neither will issues that are still In Progress.
If you only select the last column (typically called 'Done'), you will only see issues that moved in and out of the Done column — which in most cases is not very useful. Your completed issues won't show up, as they are still located in the Done column. Selecting the last column will therefore often not make much sense, unless perhaps your rapid board maps to only part of your workflow.
Click Refine at the top right of the chart to select which swimlane(s) to include.
Click Refine at the top right of the chart to select which Quick Filter(s) to apply.
Click the date range at the top of the chart to select the timeframe.
Each issue is displayed at the last time it moved out of any of the selected columns, as the control chart only shows a single data point for each issue. The date range selector simply filters out issues that don't match that date.
Even though an issue might have been updated during a selected time range, it won't show up in the control chart unless it has been "completed" during that time.
So, for example, if you have an issue that moved on day 1 from To Do to In Progress, then on day 2 from In Progress to To Do, then on day 3 from To Do to In Progress and then on day 4 from In Progress to Done, and you select the To Do and In Progress columns on your control chart, the issue will show up as a dot on day 4, and on day 4 only.
If you now choose a date range that only covers day 2 and day 3, the example issue won't show up even though it moved through your selected columns during that time.