"Cron Based Scheduling" allows you to run builds based on a schedule. This schedule can be configured using a Cron expression or via the Schedule Editor.

The schedule can be daily (times per day), weekly (days per week), monthly (days per month) or based on a Cron expression.

To schedule a Plan build using a Cron expression:

  1. Navigate to the repository settings for desired Plan, as described on Specifying the Source Repository for a Plan.
  2. In the 'Build Strategy' field, select 'Cron Based Scheduling' (see screenshot below).
  3. The 'Schedule' field will display the last configured schedule, e.g. 'Each Sunday, Wednesday and Saturday every 30 minutes from 1:00 am to 2:00 am'. Click the edit icon () next to this value to display the Schedule Editor.
  4. In the Schedule Editor (see screenshots below), select the type of build schedule that you want to configure for your Plan:
  5. 保存」ボタンをクリックします。


Screenshot above: Plan Configuration — Build Strategy: Cron Based Scheduling

Screenshots: Scheduling polling for changes