Closed epics still show up in linked values in Jira

お困りですか?

アトラシアン コミュニティをご利用ください。

コミュニティに質問

要約

User has noticed the closed epic still showing up in linked values.

原因

The user might be referring to issue status being set to Done and not the Epic status. If an issue status of an epic is changed to Done it would still show in the linked values. However if you change the epic status to Done, it will not show in the linked values.

ソリューション

エピックを ”完了” にする

Epic status isn't an automatic custom field, and you can set the value manually. If you set the Epic to Done, it will disappear from the agile board and you will not be able to find it in the Epic Link field. It will also disappear from the Epics panel.

You can mark your epic as done by going to Backlog, opening the Epics panel and selecting Mark as Done for your epic. 


Marking an epic as Done doesn't have any impact on the workflow status of the Epic or its linked issues

最終更新日 2021 年 9 月 28 日

この内容はお役に立ちましたか?

はい
いいえ
この記事についてのフィードバックを送信する
Powered by Confluence and Scroll Viewport.